SUMMITSLAYER · OFFLINE READING
Sumon Dake
Japan · 1537 m
Reviewed routes
No reviewed route is included. Missing route information does not establish safe or legal access.
About this mountain
Japan
37.3977778
守門岳
139.1366667
Hakama-dake is the main peak within a system that also includes Seiun-dake, O-dake and Nakatsumata-dake.
Sumon Dake
1537
Niigata
Sources and scope
selected Sumon-dake summit
Sumon-dake mountain system
- 日本の主な山岳標高一覧 (Japan’s principal mountains) — Geospatial Information Authority of Japan · checked 2026-11-04
- 守門岳 — Nagaoka City · checked 2026-11-04
Access & planning
- Name
Futakuchi
Grade3-B
Time (hours)6.5
Distance (km)9.4
Ascent (m)1010
- Name
Ohara
Grade3-B
Time (hours)7
Distance (km)6.9
Ascent (m)900
- Name
Irishiogawa
Grade5-B
Time (hours)9.3
Distance (km)28.3
Ascent (m)1860
- Name
Yoshigahira–O-dake–Hakama-dake
Levelintermediate or above
Ascent Hours Approx6
Descent Hours Approx5
Verify current trail and road status with the responsible municipality before travel.
Seasonal road closures normally affect some approaches from mid-November to late May.
Residual snow can create route-finding and avalanche hazards.
The Yoshigahira approach includes steep terrain, a documented wrong river-crossing path, and bear risk.
Deteriorated boardwalk sections may be slippery; check current maintenance information.
Sources and scope
three officially graded Sumon-dake routes in snow-free good-weather conditions
Yoshigahira approach via O-dake to Hakama-dake
- 新潟 山のグレーディング(五十音順) — Niigata Prefecture · checked 2026-11-04
- 守門岳 — Sanjo City · checked 2026-11-04
Permits & local services
Seasonal road closures normally affect some approaches from mid-November to late May.
Residual snow can create route-finding and avalanche hazards.
The Yoshigahira approach includes steep terrain, a documented wrong river-crossing path, and bear risk.
Deteriorated boardwalk sections may be slippery; check current maintenance information.
Submit a climbing plan and share the itinerary.
Carry emergency food.
Check current trail, road, weather and snow information before departure.
Sources and scope
Sumon-dake approaches and general Niigata mountain operations
- 守門岳 — Sanjo City · checked 2026-11-04
- 登山・トレッキング情報 — Uonuma City Tourism Division · checked 2026-11-04
- 登山情報 — Niigata Prefectural Police · checked 2026-11-04
Nature & wildlife
The broader mountain system includes extensive beech forest and alpine-plant habitat; this is not a summit-specific species-occurrence claim.
Sources and scope
Sumon-dake mountain system, not summit-specific species occurrence
Culture & local context
Sumon Daimyojin is enshrined on O-dake, a component peak of the mountain system.
Sources and scope
O-dake, a component peak of the Sumon-dake system; not the Hakama-dake summit
- 守門岳登山 — Tochio Tourism Association · checked 2026-11-04
Conservation
Seasonal road closures normally affect some approaches from mid-November to late May.
Residual snow can create route-finding and avalanche hazards.
The Yoshigahira approach includes steep terrain, a documented wrong river-crossing path, and bear risk.
Deteriorated boardwalk sections may be slippery; check current maintenance information.
Sumon Dake lies within Echigo Sanzan-Tadami Quasi-National Park. Stay on formal boardwalks and trails where open to avoid trampling adjacent vegetation.
Sources and scope
managed ridgeline boardwalk project area on Sumon-dake
Echigo Sanzan-Tadami Quasi-National Park
- 自然環境整備計画(国定公園等整備事業)令和5年度~令和9年度 — Niigata Prefecture · checked 2026-11-04
- 国定公園 — Niigata Prefecture · checked 2026-11-04
- 第44回自然公園等小委員会諮問案件 資料3-3 — Ministry of the Environment, Japan · checked 2026-11-04
Safety & conditions
- Name
Futakuchi
Grade3-B
Time (hours)6.5
Distance (km)9.4
Ascent (m)1010
- Name
Ohara
Grade3-B
Time (hours)7
Distance (km)6.9
Ascent (m)900
- Name
Irishiogawa
Grade5-B
Time (hours)9.3
Distance (km)28.3
Ascent (m)1860
- Name
Yoshigahira–O-dake–Hakama-dake
Levelintermediate or above
Ascent Hours Approx6
Descent Hours Approx5
Verify current trail and road status with the responsible municipality before travel.
Seasonal road closures normally affect some approaches from mid-November to late May.
Residual snow can create route-finding and avalanche hazards.
The Yoshigahira approach includes steep terrain, a documented wrong river-crossing path, and bear risk.
Deteriorated boardwalk sections may be slippery; check current maintenance information.
Submit a climbing plan and share the itinerary.
Carry emergency food.
Check current trail, road, weather and snow information before departure.
Sumon Dake lies within Echigo Sanzan-Tadami Quasi-National Park. Stay on formal boardwalks and trails where open to avoid trampling adjacent vegetation.
Sources and scope
Yoshigahira approach via O-dake to Hakama-dake
Sumon-dake approaches and general Niigata mountain operations
managed ridgeline boardwalk project area on Sumon-dake
- 守門岳 — Sanjo City · checked 2026-11-04
- 登山・トレッキング情報 — Uonuma City Tourism Division · checked 2026-11-04
- 登山情報 — Niigata Prefectural Police · checked 2026-11-04
- 自然環境整備計画(国定公園等整備事業)令和5年度~令和9年度 — Niigata Prefecture · checked 2026-11-04